Rostekhnadzor confirms Rosatom ready for Smolensk region nuclear units
Russia's Rostekhnadzor has confirmed Rosatom's readiness to build two power units at Smolensk NPP-2 in Smolensk region, which borders Belarus. The planned plant is to have VVER-optim reactors with a total capacity of 2.4 GW.

Rostekhnadzor concluded that there were no obstacles to issuing licences for the plant. The plant would gradually replace the operating Smolensk NPP near Desnogorsk, about 100 kilometres from Smolensk. If everything goes according to plan, it could be built by 2034. Belarusian officials said the general agreement with Rosatom on construction of the third power unit of the BelNPP was at a high stage of readiness.![]()
![]()
Russian nuclear physicist and radiation safety expert Andrei Ozharovsky said it was premature to talk about the start of construction. He said only preparatory work was underway and the plant might not be completed. Ozharovsky, who participates in the antinuclear and ecological movement, described the plans as very distant and said Rosatom had previously abandoned similar projects.![]()
![]()
Sources
In this story
Russia






